发布于: 雪球转发:19回复:115喜欢:39

$赣锋锂业(SZ002460)$ $Livent(LTHM)$  $天齐锂业(SZ002466)$ 

转贴一个世界前十大锂矿的文章。赣锋在锂储量世界排第一( 243.8Mt),第二(179.4Mt),第四(108.2Mt)都有股份。而天齐占51%股份的Greenbushes在储量方面只能排第六( 86.4Mt),虽然Greenbushes现在是成本最低的矿,但排第一和第二的是粘土矿,今后开发的成本应更低,考虑到还得依靠赣锋的技术,赣锋在这两个粘土矿比较主动。可以说赣锋控制的低成本锂矿远超天齐,在卤水方面,天齐高价买SQM,赣锋低价控股阿根廷盐湖,又胜一筹。所以,天齐粉动不动就是我家里有矿的说法是不成立的

1. Sonora Lithium Project - 243.8Mt


Sonora Lithium Project is the biggest lithium deposit in the world.

The Sonora lithium project, located in Sonora, Mexico, is the biggest lithium deposit being developed by Sonora Lithium (SLL), a joint venture (JV) of Bacanora Minerals (77.5%) and Ganfeng Lithium (22.5%).

The mine is estimated to hold proven and probable reserves of 243.8Mt, containing 4.5Mt of lithium carbonate-equivalent (LCE). The bankable feasibility study for the La Ventana concession, which will account for 88% of the mined ore from the project, has been completed that estimates an initial mine life of 19 years.

Sonora will be an open-pit operation proposed to be developed in two stages with the first stage having a production capacity of 17,500 tonnes per annum (tpa) of lithium carbonate. Stage two will double the production capacity to 35,000tpa.

2. Thacker Pass Lithium Project - 179.4Mt

[caption id="attachment_82605" align="alignnone" width="450"]

Thacker Pass Lithium Project is being developed in two stages. 

The Thacker Pass lithium project is located in Humboldt County, Nevada, US. It is 100% owned and operated by Lithium Americas.

The mine is estimated to contain proven and probable reserves of 179.4Mt containing 3.1Mt of lithium carbonate equivalent (LCE). It has an estimated mine life of 46 years.

The pre-feasibility study (PFS) for the project was completed in August 2018, which proposed the two-phase mine development using open-pit methods. Phase one is expected to be commissioned in 2022 with a production capacity of 30,000tpa of battery-grade Li2CO3 while phase two will increase the capacity to 60,000tpa with a commissioning date of 2026.

3. Wodgina Lithium Project - 151.94Mt

[caption id="attachment_82606" align="alignnone" width="450"]

Wodgina Lithium Project will be developed as an open-pit mine. 

The Wodgina lithium project is located 100km south-east of Port Hedland in Western Australia. The mine was earlier 100% owned by Mineral Resources. In August 2019, the company entered an agreement with Albemarle Corporation to form a 60:40 joint venture to develop the mine.

The open-pit mine is estimated to contain probable reserves of 151.94Mt grading 1.17% Li2O. Construction of the spodumene concentrate plant is currently ongoing with the first train being commissioned in June 2019 while the remaining three are expected to be commissioned in 2020. First ore from the mine is expected in the first quarter of 2020.

Wodgina is expected to produce 833,000 wet tonnes (750,000 dry tonnes) of 6% spodumene concentrate a year, upon commissioning.

4. Pilgangoora Lithium-Tantalum Project - 108.2Mt

The first stage of the Pilgangoora Lithium-Tantalum Project achieved commercial production in April 2019. Image courtesy of Pilbara Minerals.[/caption]

The Pilgangoora lithium-tantalum project is situated in the Pilbara region of Western Australia. The mine is 100% owned and operated by Pilbara Minerals.

The proven and probable reserves of the mine are estimated to be 108.2Mt grading 1.25% Li2O and 120 parts per million (ppm) Ta2O5 and 1.17% Fe2O3. The definitive feasibility study (DFS) of the project was completed in September 2016 and commercial production was achieved in April 2019.

The mine is expected to produce 320,000tpa of 6% spodumene concentrate through open-cut methods. Pilbara Minerals plans to undertake the second stage expansion of the mine to increase the production capacity to 5Mtpa, allowing it to produce 850,000tpa of 6% spodumene concentrate.

5. Earl Grey Lithium Project - 94.2Mt

The Earl Grey Lithium Project is expected to be commissioned in 2020. 

The Earl Grey lithium project, also known as the Mt Holland lithium project, is located in the Forestania Greenstone Belt in Mt Holland, Western Australia. It is owned by Kidman Resources (50%) and Sociedad Química y Minera de Chile (SQM, 50%) under a JV named Covalent Lithium.

The mine is estimated to contain proven and probable reserves of 94.5Mt grading 1.5% Li2O. The PFS for the project was completed in December 2018 while the DFS is currently underway.

The mine is expected to produce 411,233t of spodumene concentrate a year over its 47-year mine life, upon commissioning in 2020.

6. Greenbushes Lithium Project - 86.4Mt

Greenbushes Lithium Project is operated by Talison Lithium. 

The Greenbushes lithium project is located in Greenbushes, Western Australia. It is owned by Chinese mining company Tianqi Lithium and operated by Talison Lithium, which is 51% owned by Tianqi Lithium.

The mine is estimated to contain proven and probable reserves of 86.4Mt grading 2.35% Li2O. It is installed with two processing plants, which produce technical and chemical-grade lithium concentrates.

A second chemical-grade lithium processing plant is scheduled to be commissioned in 2019, which will double the mine’s processing capacity to 1.3Mtpa of lithium concentrates. Construction of a third processing plant is to start in the third quarter of 2019.

7. Whabouchi Lithium Project - 36.6Mt

Whabouchi Lithium Project is expected to produce 205,000tpa of concentrate.

The Whabouchi lithium project is located in the James Bay area in central Quebec, Canada. It is 100% owned and operated by Nemaska Lithium, a Canadian mining company.

The mine is estimated to contain proven and probable reserves of 36.6Mt grading 1.3% Li2O. It is planned to be developed using open-pit and underground mining methods over its 33- year mine life. Underground mining will be undertaken in year 26 upon depletion of the open-pit reserves.

Whabouchi is expected to produce 205,000tpa of concentrate. Construction is expected to begin in November 2019, upon securing financing. Production is expected to be started in June 2020.

8. Altura Mining’s Pilgangoora Lithium Mine - 34.2Mt

Altura Mining’s Pilgangoora Lithium Mine is estimated to hold 34.2Mt of proven and probable reserves. Image courtesy of Altura Mining.[/caption]

Altura Mining’s 100%-owned Pilgangoora lithium mine is located in the Pilbara region of Western Australia. The mine is estimated to contain 34.2Mt of proven and probable reserves grading 1.04% Li2O. The mine is expected to have a life of 13 years.

The open-pit operation is being developed in two stages. The first stage was commissioned in early-2019 and is expected to produce 220,000tpa of lithium spodumene concentrate.

Altura has completed a DFS for stage two expansion of the mine, which will increase the annual production capacity to 440,000tpa. Stage two is expected to be undertaken upon securing long-term offtake agreements and necessary funding, following which first production is expected within 18 months.

9. Goulamina Lithium Project - 31.2Mt

Goulamina Lithium Project will be developed using open-cut mining methods. 

The Goulamina lithium project is 100% owned and operated by Mali Lithium, a mining company based in Australia. It is located in the Bougouni region of southern Mali and planned to be developed using open-cut methods.

The mine is estimated to contain probable reserves of 31.2Mt grading 1.56% Li2O and indicated and inferred resources of 103Mt grading 1.34% Li2O. The estimated operating life of the mine is 16 years while the production capacity is 362,000tpa of concentrate.

Mali Lithium has completed the pre-feasibility study (PFS) for the project and is currently carrying out the DFS. The final investment decision on the project is expected to be taken in the second half of 2020.

10. Arcadia Lithium Project - 26.9Mt

Arcadia Lithium Project is located near Harare in Zimbabwe.

The Arcadia lithium project is open-pit mine located 38km from Harare, Zimbabwe. It is owned and operated by Prospect Resources, an Australian mining company.

The mine is estimated to hold proven and probable reserves of 29.8Mt grading 1.31% Li2O. It is expected to have a mine life of 12 years with an average production of 212,000tpa of 6% spodumene concentrates, 216,000tpa of petalite concentrate and 188,000lb of tantalum a year.

The DFS for the project was completed in November 2018. The mine is currently under construction and expected to be commissioned in the second half of 2020.

Related Companies

DomeShelter Australia

High Quality Fabric Structures - Engineered to Protect

TowHaul

Heavy-Duty Lowboy and Haul Truck Recovery Solutions for the Mining Sector


精彩讨论

总总总2020-11-24 12:58

天齐资源不如赣锋???
真是沙雕 

we5181162020-11-24 23:56

$赣锋锂业(SZ002460)$ 
你是新来的?
第二大矿属LAC,LAC的最大股东是赣锋,赣锋间接拥有第二大矿,LAC要钱没钱,要技术没技术,不拼赣锋这个干爹会一事无成。LAC股价为什么涨的好?就是因为家里有矿,还可以拼爹。
赣锋在第四大矿的公司不但有股份,还有包销。
你稍微花点时间计算一下赣锋在这些矿的股权及储量,会同意我说的:赣锋控制的低成本锂矿远超天齐.
$Lithium Americas(LAC)$

刘大拿2020-11-24 17:01

赣锋年初就宣布过:权益锂资源量已经是世界第一了,只是齐粉不愿意去研究。裤叉里盐湖品质比SQM还高,也不愿意去正视。人就这样,一旦走火入魔,根本就看不见相反意见的。

全部讨论

逍遥生-l2021-04-10 11:59

原来是神棍

迷途识返2021-04-10 10:24

涨了看涨,跌了看跌是追涨杀跌的一种,追涨杀跌并不是简单的涨了看涨,跌了看跌,而要要结合大环境,情绪周期,个股基本面来看,在上升情绪周期中,如医美板块进入主升浪,那对于领涨龙头,是看多还是看跌?那对于次新板块,顺控发展复牌,一字跌停,那么对于现在的泰坦来说,是看跌还是看涨?对于出政策影响的分众传媒,下跌趋势中,看涨还是看跌?如高端白酒,跌到30倍,还在下跌趋势中,看涨还是看跌?
右侧多看大白马趋势反转的那十几条K线,可能会有答案。

迷途识返2021-04-10 10:15

如有冒犯请多包涵。天齐目前还没走出下降趋势,身在其中的股东们必定是对其抱有极大的期待和信仰,这等信仰已胜过黄金了,毕竟天齐几乎每天在跌,为股东们损失真金白银,那我这点微言微语更如蜉蝣撼树了。
我觉得跟火车站拉人还是有不同的,火车站拉客是不挑客人的,与客人的属性无关。而买天齐的,大多是冲着“锂矿第一股”的噱头和“债务问题解决的困境反转”而来的,更多的是赌徒属性,高风险,高收益。而赣锋没有太大的短板,更多是基本面属性,更平稳。而且,锂电板块一直是一荣俱荣,一损俱损,天齐拉的时候,赣锋也在拉,赣锋拉的时候,天齐也在拉,跟车站拉客那种抢占市场份额,不是你的就是我的损人利己模式不是很一样吧。

逍遥生-l2021-04-10 10:12

那不还是追涨杀跌么,涨了看涨跌了看跌,啥是右侧?

迷途识返2021-04-10 10:01

小资金没有定价权,左侧怎么做呢?做右侧貌似是最优解,右侧是追涨的一种。不幸左侧买入当然要杀跌,因为后面还要跌。

深海鱼cym2021-04-10 09:28

又是一个跑到天齐来为赣锋拉客的,和火车站拉人的有啥差别呢?前面天齐涨的时候也是这样,又出来了,恶心!买了不少赣锋吧

逍遥生-l2021-04-10 09:02

第一次见把追涨杀跌说得理直气壮的

狐狸河Dufresne2021-04-10 08:00

田七粉还活在2015年

迷途识返2021-04-10 07:43

还是那句:
1,吾等小散只要一个有辨识度的亮点就会构成买入理由,而深入分析的占比很少,我选择人多的一面。
2,走势反映一切,赣锋综合基本面更佳,更获得市场认可,昨天上影后,隐约向上变盘了,而天齐还是空头走势。

股市板上飞2021-04-10 01:29

海洋里面锂资源更多,有啥用呢,开采成本太高就是致命伤